by Joan Hamer
originally published in Pine Meadow Knitting News
Materials:
- Worsted weight yarn; 1 skein each of two contrasting colors
- Size 3 (3.25 mm) & 5 (3.75 mm) needles (or size needed to obtain gauge)
Gauge: 5 sts = 1″ in slip stitch pattern
Right Mitten:
Cast on 40 sts with MC. Knit in K1, P1 ribbing for 3″, increasing 4 sts evenly spaced on last row.
Change to larger needles and attach CC.
Work in slip stitch pattern as follows:
- Row 1: (MC) – K1, *sl 1 purlwise, K1. Repeat from * across ending with K1.
- Row 2: (MC) – Purl
- Row 3: (CC) – K1, *K1, sl 1 purlwise across ending with K1.
- Row 4: (CC) – Purl
Repeat rows 1-4 for 2″ above ribbing ending with row 4. Cut CC.
Thumb Opening:
- Knit 1st 8 sts with MC and put on holder, attach CC and work in pat to end.
- Purl back, casting on 8 sts at end of row.
Continue in pattern until piece meas. 6-1/2″ above ribbing, ending with row 4 and decreasing 2 sts in last row. Cut CC.
Top:
- Row 1: With MC, K5, K2 tog across row.
- Row 2: Purl
- Row 3: K4, K2 tog across row.
- Row 4: Purl
- Row 5: K3, K2 tog across row.
- Row 6: Purl
- Row 7: K2, K2 tog across row.
- Row 8: Purl
- Row 9: K1, K2tog across row.
- Row 10: Purl
- Row 11: K2, K2 tog across row. Cut yarn leaving 18″. Thread yarn through
- sts and let hang.
Thumb:
- Put 8 sts from holder onto needle.
- Attach MC and pick up 2 sts at intersection.
- Pick up 8 sts from cast on sts (18 sts).
- Work in st st for 1-3/4″.
- Next Row: K1, K2 tog across.
- Next Row: Purl
- Next Row: K2 tog across. Cut yarn leaving end for sewing. Sew thumb seam.
Sew side of mitten and weave in ends.
Left Mitten:
Same as right mitten to thumb opening ending ready to work row 1 of pattern.
Thumb Opening:
- Work in pattern to last 8 sts.
- Knit last 8 sts in MC and put on holder.
- Cast on 8 sts at beg of row and purl back.
Finish as for right mitten.